Traveling inbound, El Metro will use a temporary stop on Loring Street, a block further from Seymour.
Tuesday, August 31, 2010
Emergency reconstruction closes street
Traveling inbound, El Metro will use a temporary stop on Loring Street, a block further from Seymour.
Thursday, August 26, 2010
Overpass construction causes detours
Maryland Avenue, between Chihuahua and Guadalupe, will be closed beginning Monday, Aug. 30, for about three weeks and re-open on Friday, Sept. 17, at 5:30 p.m.
Monterrey Avenue, south of Chihuahua, will remain closed until Wednesday, Sept. 1, at 5:30 p.m. Detour in effect.
Sanders Avenue between Guadalupe and Chihuahua Streets (US 83) will remain closed for the duration of the project. Detour in effect.
Friday, August 20, 2010
Construction to interrupt San Bernardo traffic
Construction is scheduled from 8 p.m. to 10 a.m., starting Aug. 24.
The replacement of the water line is anticipated to take approximately fourteen hours for completion. Progress updates will be made available by the
Motorists and pedestrians traveling through the area are urged to adhere to all posted traffic control signs and devices to provide safety to everyone.
Monday, August 16, 2010
Monterrey Street to close in construction project
Sanders Avenue between Guadalupe and Chihuahua streets U.S. 83 will remain closed for the duration of the project.
The traveling public is asked to exercise extreme caution and observe all traffic safety signs, road markings and channelization devices in and around the work area. Use caution around heavy machinery and tractor-trailer traffic.
Construction work to temporarily close street
Lane closures on U.S. 59
The construction is scheduled from Monday through Thursday from 7:30 a.m. to 7:30 p.m.
The paving of the main lanes will be done as a moving operation, the working area is two miles, and the traveling public should be prepared to merge to an open lane. The traveling public is advised to drive with extreme caution, slow down, observe/adhere to the traffic control devices, and watch out for the road maintenance crew working at this location.
This labor is part of RMC: 6209-02-001, which was awarded to Bick's Construction. This project consists of planing,overlay, and pavement markings. The work location is Webb County's U.S. 59.
Carlos G. Rodriguez, P.E., Laredo area engineer for the Texas Department of Transportation Laredo District is responsible for this project.
Tuesday, August 3, 2010
Construction to disrupt service
A water line tie-in Thursday is scheduled to cause service interruption in the downtown area from 7 p.m. to 4 a.m.
The affected areas are Hidalgo Street from Salinas Avenue to San Agustin Avenue as well as Flores Avenue from Hidalgo Street to Lincoln Street.
MDA, a private contractor hired by the City of Laredo, will tie-in a new 8-inch water line to an existing 8-inch water line, causing temporary interruption of water services.
The tie-in is anticipated to take approximately nine hours for completion.
Motorists and pedestrians traveling through the area are cautioned to heed all posted traffic control signs and devices to provide safety to all citizens.