Tuesday, November 9, 2010
TxDOT announces Guadalupe-Chihuaha street closures
WHEN/WHERE: US 83 (Guadalupe-Chihuahua Sts.) cross streets between Monterrey Ave. and Cedar Ave. in Laredo/Webb County:
● NEW – Maryland Avenue, between Chihuahua and Guadalupe, will be closed beginning on Wednesday, November 10, 2010 and will re-open Wednesday, December 1, 2010 at 5:30 p.m. Duration of street closure is three (3) weeks, approximately.
● ONGOING - Until further notice, the outside eastbound lane on Chihuahua Street from Monterrey to the west and Sanders to the east will remain closed on a daily basis until 4 p.m. in order to conduct utility work.
● CLOSED INDEF. - Lexington Avenue, between Chihuahua and Guadalupe was closed on Tuesday, September 7, 2010 and will remain closed for the duration of the project as it is called for in the plans to be closed indefinitely. Detour in effect.
● CLOSED INDEF. - Sanders Avenue between Guadalupe and Chihuahua Streets (US 83) will remain closed indefinitely for the duration of the project. Detour in effect.
The traveling public is asked to exercise extreme caution and observe all traffic safety signs, road markings and channelization devices in and around the work area. Please use caution around heavy machinery and tractor-trailer traffic.
The US 83 (Guadalupe-Chihuahua Streets) railroad grade separation project (CSJ# 0086-01-052) is being constructed by Anderson Columbia Co., Inc. at a cost of $10.8 million.
Thursday, October 28, 2010
Utilities construction work closes lane, causes interruption of water service
Traffic control equipment and flaggers will be present at location, but motorists should proceed with caution when driving in the area.
Additionally, Water interruption is expected between five to seven hours, on that first section of Rosson Lane entering from Jacaman Road on this same day. Residents in the area should be prepared for an interruption of water service until the completion of the project.
Monday, October 25, 2010
LISD construction project to cause road closure
East Locust Street will be closed at the intersections of Springfield Avenue, Marcella Avenue, Sanders Avenue, and Monterrey Avenue.
Monday, October 4, 2010
Updated: Water line installation to interrupt traffic on Bartlett
This water line will connect from the new elevated storage tank that is located at the intersection of
Work is anticipated to take approximately 11 hours for completion. Progress updates will be made available by the
Motorists and pedestrians traveling through the area are urged to adhere to all posted traffic control signs and devices to provide safety to everyone.
Monday, September 20, 2010
Rollover closes down I-35
The traveling public heading southbound on I-35 is being detoured to take the access road on exit 18 and will be able to get up on I-35 at the Uniroyal Entrance where Flying J is located. The detour is scheduled through 5 p.m.
The traveling public is advised to slow down, drive with extreme caution, follow the marked detour, and watch out for the road maintenance crew working at that location.
Monday, September 13, 2010
Installation of water valves to cause reduced water pressure
The work is scheduled for Monday, Sept. 20, from 11:30 p.m. to 7:30 a.m. Tuesday, Sept. 21.
Water services will be slightly interrupted causing reduced water pressure for all customers located along Mines Road from Interstate 35 to the Millenium Subdivision.
Work is anticipated to take approximately eight hours for completion. Upon completion of water line improvements, the water line will be flushed and services will be restored.
Temporary shut down to leave some customers without water
The outage is scheduled from 10-11 a.m.
Customers to be affected include those who reside along
Water services will be interrupted for approximately one hour.
To report water or wastewater service problems, please contact the City of Laredo